{"top_articles":[{"meta_author":null,"meta_image":"https:\/\/www.autonocion.com\/us\/wp-content\/uploads\/2026\/11\/drones-willow-run.jpg","meta_title":"A 3.5-million-square-foot car plant once rolled a four-engine bomber off its line every 63 minutes, and now the military, which says it will buy millions of drones, is in talks with the car industry to build their motors, actuators, sensors and lidar","pv":1064,"rr":8,"url":"https:\/\/www.autonocion.com\/us\/willow-run-bomber-plant-drone-parts\/"},{"meta_author":"Autonoci\u00f3n Redacci\u00f3n","meta_image":"https:\/\/www.autonocion.com\/wp-content\/uploads\/2026\/11\/juan-sebastian-elcano-verrazzano-1800x1013-1.jpg","meta_title":"Al velero m\u00e1s famoso de la Armada le han adaptado el eje que mueve su h\u00e9lice para un cambio de motor: el Juan Sebasti\u00e1n de Elcano sale del dique preparado para una propulsi\u00f3n el\u00e9ctrica a\u00fan en estudio","pv":924,"rr":11,"url":"https:\/\/www.autonocion.com\/juan-sebastian-elcano-sale-dique-seco\/"},{"meta_author":null,"meta_image":"https:\/\/www.autonocion.com\/us\/wp-content\/uploads\/2026\/11\/04-hs2-tbm-karen-cutterhead.jpg","meta_title":"A 1,790-ton tunnel boring machine and its twin digging toward central London are past the halfway mark of a 4.5-mile run as deep as 217 feet, each moving about 52 feet a day as they line the bores with 48,294 concrete segments, and both are due to stop short of the station in 2027","pv":472,"rr":13,"url":"https:\/\/www.autonocion.com\/us\/tunnel-boring-machines-halfway-euston\/"},{"meta_author":null,"meta_image":"https:\/\/www.autonocion.com\/us\/wp-content\/uploads\/2026\/11\/hardy-dam-poor-spillway-flood.jpg","meta_title":"A 95-year-old hydro dam holding back a 4,000-acre Michigan pond has been officially downgraded to poor condition because its spillway can't pass the biggest flood possible there, and the $350 million fix now hinges on a state vote due December 17","pv":264,"rr":12,"url":"https:\/\/www.autonocion.com\/us\/hardy-dam-poor-spillway-flood\/"},{"meta_author":null,"meta_image":"https:\/\/www.autonocion.com\/us\/wp-content\/uploads\/2026\/11\/03-tx1-triso-x-oak-ridge-1.jpg","meta_title":"A 214,000-square-foot nuclear fuel factory in Tennessee went up with welds thinner than the 5\/8-inch throat its main force-resisting system was designed for across 10 X-braced steel frames, and regulators have now made the fixes binding after the design was cut to 7\/16 inch","pv":252,"rr":2,"url":"https:\/\/www.autonocion.com\/us\/nuclear-fuel-factory-thin-brace-welds\/"},{"meta_author":null,"meta_image":"https:\/\/www.autonocion.com\/us\/wp-content\/uploads\/2026\/11\/pebble-reactor-construction-permit-texas.jpg","meta_title":"A four-reactor nuclear plant designed to refuel while running on uranium pebbles the size of billiard balls got the first construction permit for its kind of reactor in nearly 60 years, clearing a Texas chemical site to build 320 megawatts right next to the factories it will heat","pv":240,"rr":4,"url":"https:\/\/www.autonocion.com\/us\/pebble-reactor-construction-permit-texas\/"},{"meta_author":null,"meta_image":"https:\/\/www.autonocion.com\/us\/wp-content\/uploads\/2026\/11\/shasta-dam-construction-tower-buoys-usbr.jpg","meta_title":"A 602-foot dam in Northern California is showing again, for the first time since 2022, the steel tower that helped pour its concrete around the clock for four and a half years, now that the reservoir sits more than 94 feet below full, and buoys have been tied to it for safety","pv":236,"rr":3,"url":"https:\/\/www.autonocion.com\/us\/602-foot-dam-steel-tower-shasta-lake\/"},{"meta_author":null,"meta_image":"https:\/\/www.autonocion.com\/us\/wp-content\/uploads\/2026\/11\/10-ch53k-a6-dahlgren-usnavy.jpg","meta_title":"A 36,000-pound-capacity heavy-lift helicopter carried a retired Navy attack jet about 18 miles on a sling, partly over the Potomac River, from the Virginia test base where the airframe stayed after the type left service in 1997 to a Marine airfield that plans to use it for training","pv":204,"rr":14,"url":"https:\/\/www.autonocion.com\/us\/helicopter-sling-retired-navy-attack-jet-potomac\/"},{"meta_author":null,"meta_image":"https:\/\/www.autonocion.com\/us\/wp-content\/uploads\/2026\/11\/06-wolf-creek-nrc.jpg","meta_title":"A 10-plant alert went out after wiring defects turned up in two actuators bound for a Kansas reactor's emergency feedwater system, the parts that set how fast a steam turbine spins its pump, and every site using them is being advised to confirm its spares energize and stroke","pv":168,"rr":9,"url":"https:\/\/www.autonocion.com\/us\/nuclear-plants-spare-actuators-wiring-check\/"},{"meta_author":null,"meta_image":"https:\/\/www.autonocion.com\/us\/wp-content\/uploads\/2026\/11\/42-megawatt-turbine-core-supersonic-engine.jpg","meta_title":"A turbine core built for both a 42-megawatt data center generator and a 40,000-pound-thrust supersonic jet engine lit on its second try on the Colorado plains and spun to 6,500 rpm with nearly 2,000 sensors watching, a first for the largest jet engine a startup has designed","pv":104,"rr":15,"url":"https:\/\/www.autonocion.com\/us\/42-megawatt-turbine-core-supersonic-engine\/"},{"meta_author":null,"meta_image":"https:\/\/www.autonocion.com\/us\/wp-content\/uploads\/2026\/11\/480-foot-concrete-dam-north-carolina-swelling-crack-slot-diamond-wire-five-years.jpg","meta_title":"A 480-foot concrete dam in North Carolina, the tallest in the eastern United States, has been swelling for decades, enough to crack itself where it curves, so about every five years the federal utility that owns it saws a slot through it with diamond wire to give it room","pv":88,"rr":1,"url":"https:\/\/www.autonocion.com\/us\/480-foot-concrete-dam-north-carolina-swelling-crack-slot-diamond-wire-five-years\/"},{"meta_author":null,"meta_image":"https:\/\/www.autonocion.com\/us\/wp-content\/uploads\/2026\/11\/drone-boat-launches-quadcopters-winged-drone.jpg","meta_title":"A 19-foot drone boat that can stay out at sea for weeks carries six remote-piloted quadcopters sealed inside its hull and has launched them in trials, then fired a longer-range winged drone from the same compartment, with all of it flown from a control room anywhere in the world","pv":84,"rr":5,"url":"https:\/\/www.autonocion.com\/us\/drone-boat-launches-quadcopters-winged-drone\/"},{"meta_author":null,"meta_image":"https:\/\/www.autonocion.com\/us\/wp-content\/uploads\/2026\/11\/two-week-seabed-stirling-generator-20-watts.jpg","meta_title":"A heat-to-power generator sat on the seabed for two weeks and put out more than 20 watts of electricity, the first time this kind of Stirling machine has made power on the ocean floor, using electric heat in place of the radioisotope fuel still to come","pv":80,"rr":10,"url":"https:\/\/www.autonocion.com\/us\/two-week-seabed-stirling-generator-20-watts\/"},{"meta_author":null,"meta_image":"https:\/\/www.autonocion.com\/us\/wp-content\/uploads\/2026\/11\/uranium-enriched-past-5-percent-cylinder.jpg","meta_title":"A desert plant that can supply about a third of the enriched uranium U.S. reactors use filled its first commercial cylinder of uranium enriched past 5%, something the company says no other plant in the Western world offers, so existing reactors could run longer between refuelings","pv":60,"rr":7,"url":"https:\/\/www.autonocion.com\/us\/uranium-enriched-past-5-percent-cylinder\/"},{"meta_author":null,"meta_image":"https:\/\/www.autonocion.com\/us\/wp-content\/uploads\/2026\/11\/908-megawatt-ohio-reactor-football-hole-6-inches-steel-lid-boric-acid-liner-2155-psi.jpg","meta_title":"A 908-megawatt Ohio reactor once ran with a football-sized hole eaten through more than 6 inches of its steel lid by leaking boric acid, leaving a stainless liner three-eighths of an inch thick to hold back 2,155 psi, and its replacement lid came from a plant that never opened","pv":52,"rr":6,"url":"https:\/\/www.autonocion.com\/us\/908-megawatt-ohio-reactor-football-hole-6-inches-steel-lid-boric-acid-liner-2155-psi\/"}],"enrichment":{"url":"https:\/\/www.autonocion.com\/us\/14-ton-boring-machine-backed-1290-feet-new-jersey-bay\/","title":"Frequently asked questions","subtitle":"AI-assisted contextual content, generated to enrich your reading.","content":"<h3>What is microtunneling and how does it differ from conventional tunneling methods?<\/h3>\n<p>Microtunneling is a trenchless construction technique in which a remotely operated microtunnel boring machine (MTBM) installs pipe strings by pipe jacking from a launch shaft to a reception shaft. Unlike traditional tunneling, it does not require workers inside the bore, uses laser or gyro guidance for precision, and simultaneously excavates and installs lining segments without open excavation along the alignment.<\/p>\n\n<h3>How do Permalok\u00ae Radial Bending Joints enable steel pipes to follow a curved alignment without welding?<\/h3>\n<p>Permalok\u00ae Radial Bending Joints are precision-machined, press-fit connections that lock pipe segments together under axial jacking loads. Their engineered tolerances allow slight angular rotation between pipes, creating a continuous, curve-following steel casing without the time and labor of field welding.<\/p>\n\n<h3>What guidance technologies ensure accurate steering of a microtunneling machine along a curved tunnel path?<\/h3>\n<p>Curved microtunneling relies on surface-mounted total station systems\u2014often paired with laser targets\u2014and onboard gyroscopic or laser-beam guidance to continuously monitor and adjust the MTBM\u2019s alignment and inclination in real time, ensuring the cutterhead follows the designed radius.<\/p>\n\n<h3>What soil treatment and lubrication methods are used to reduce friction and ground settlement during microtunnel pipe jacking?<\/h3>\n<p>Operators create a controlled overcut between the bore and pipe and inject bentonite or polymer-based slurry into the annular gap. This lubricant reduces jacking resistance, stabilizes the surrounding soil, and minimizes ground settlement by preventing the tunnel lining from rubbing directly against the formation.<\/p>\n\n<h3>Which regulatory approvals are typically required for underwater tunneling projects in U.S. coastal waters?<\/h3>\n<p>Projects under navigable U.S. waters generally require a Section 404 permit from the U.S. Army Corps of Engineers for discharges of fill material under the Clean Water Act, a Section 10 Rivers and Harbors Act permit for any structures in navigable waters, and often state coastal zone management consistency certifications.<\/p>\n\n<h3>How does a retractable cutterhead facilitate the reversal of a microtunneling machine through its installed casing?<\/h3>\n<p>A retractable cutterhead can be drawn back into the machine\u2019s shield after boring, reducing its effective diameter. This allows the MTBM to reverse through the newly installed pipe string without the cutterhead obstructing the interior of the casing, enabling recovery through the launch shaft.<\/p>","footer":"This content was generated using AI and reviewed according to publisher guidelines.","icon":"<svg xmlns='http:\/\/www.w3.org\/2000\/svg' viewBox='0 0 64 64'><rect x='8' y='12' width='28' height='22' rx='3' fill='#a855f7'\/><path d='M 14 34 L 10 38 L 10 34 Z' fill='#a855f7'\/><text x='22' y='28' font-family='Arial, sans-serif' font-size='18' font-weight='bold' fill='white' text-anchor='middle'>?<\/text><rect x='28' y='28' width='28' height='22' rx='3' fill='#c084fc'\/><path d='M 50 50 L 54 54 L 54 50 Z' fill='#c084fc'\/><path d='M 36 39 L 40 43 L 48 35' stroke='white' stroke-width='3' fill='none' stroke-linecap='round' stroke-linejoin='round'\/><\/svg>","model":"o4-mini","web_search":true,"cost":0.134962,"usage":{"input_tokens":28715,"input_tokens_details":{"cached_tokens":1024,"cache_write_tokens":0},"output_tokens":3232,"output_tokens_details":{"reasoning_tokens":2432},"total_tokens":31947},"sources":[{"title":"","url":"https:\/\/trenchlesspedia.com\/definition\/2929\/microtunneling"},{"title":"","url":"https:\/\/www.nwpipe.com\/about\/news\/introducing-the-radial-bending-joint-for-steel-pipe-microtunneling\/"},{"title":"","url":"https:\/\/www.nwpipe.com\/app\/uploads\/2023\/08\/Permalok-RBJ-Joint-Flyer-08-2023.pdf"},{"title":"","url":"https:\/\/www.microtunel.com\/en\/microt%C3%BAnel"},{"title":"","url":"https:\/\/www.sciencedirect.com\/science\/article\/abs\/pii\/S0886779819304584"},{"title":"","url":"https:\/\/www.nwpipe.com\/about\/news\/in-the-press-permalok-radial-bending-joint-marks-a-new-era-in-microtunneling\/"},{"title":"","url":"https:\/\/en.wikipedia.org\/wiki\/Trenchless_technology"},{"title":"","url":"https:\/\/www.linkedin.com\/posts\/permalok-corporation_permalok-radialbendingjoint-trenchless-activity-7423062575325691904-B6MW"},{"title":"","url":"https:\/\/pgjonline.com\/news\/2026\/june\/nwpx-completes-first-curved-steel-microtunnel-pipe-installation"},{"title":"","url":"https:\/\/static2.finnhub.io\/file\/privatedatany\/slides\/bbcf1c1b145170e58e4ca4d72f1f2830c712c3cdbdda9384097e734ce7ca0391.pdf?Authorization=3_20260430123157_c9e50a95a5762ca80c285874_096d6b42f2852f15042b09ecf71f8a0393a703fc_002_20260501123157_0007_dnld"},{"title":"","url":"https:\/\/www.portland.gov\/bes\/improvements\/methods\/microtunneling"},{"title":"","url":"https:\/\/repository.gatech.edu\/bitstreams\/55ce154d-3480-4018-9af1-560b8d89723d\/download"},{"title":"","url":"https:\/\/www.btb.termiumplus.gc.ca\/tpv2alpha\/alpha-fra.html?fchrcrdnm=56&i=&index=frb&lang=fra&sg_kp_wet=90109&srchtxt=creuser"},{"title":"","url":"https:\/\/www.nwpipe.com\/about\/news\/first-installation-of-permalok-radial-bending-joint-rbj-completes-emergency-tunnel-project-in-new-jersey\/"},{"title":"","url":"https:\/\/vitrinelinguistique.oqlf.gouv.qc.ca\/fiche-gdt\/fiche\/8355042\/microtunnelage"},{"title":"","url":"https:\/\/www.researchgate.net\/publication\/311667547_Trenchless_Installations_on_the_Lake_Oswego-Tigard_Partnership_Project_Use_of_Steel_Water_Pipe_and_Steel_Casing_Pipe_for_HDD_and_Microtunneling"},{"title":"","url":"https:\/\/dot.ca.gov\/-\/media\/dot-media\/programs\/engineering\/documents\/geotechnical-services\/202601-gm-trenchlessconstruction_a11y.pdf"},{"title":"","url":"https:\/\/pdhonline.com\/courses\/c663\/Force%20Main%20Rehab.pdf"},{"title":"","url":"https:\/\/en.wikipedia.org\/wiki\/Microtunneling"},{"title":"","url":"https:\/\/mdotjboss.state.mi.us\/webforms\/GetDocument.htm?fileName=3701.pdf"},{"title":"","url":"https:\/\/fr.wikipedia.org\/wiki\/Microtunnelage"},{"title":"","url":"https:\/\/fr.wikipedia.org\/wiki\/Technologie_sans_tranch%C3%A9e"},{"title":"","url":"https:\/\/fr.wikipedia.org\/wiki\/Micro_tranch%C3%A9e"},{"title":"","url":"https:\/\/es.wikipedia.org\/wiki\/Microt%C3%BAnel"},{"title":"","url":"https:\/\/www.epa.gov\/cwa-404\/permit-program-under-cwa-section-404"},{"title":"","url":"https:\/\/www.epa.gov\/cwa-404\/overview-clean-water-act-section-404"},{"title":"","url":"https:\/\/www.epa.gov\/cwa-404"},{"title":"","url":"https:\/\/www.epa.gov\/cwa-404\/clean-water-act-section-404-and-agriculture"},{"title":"","url":"https:\/\/www.epa.gov\/cwa-404\/clean-water-laws-regulations-and-executive-orders-related-section-404"},{"title":"","url":"https:\/\/www.epa.gov\/cwa404g\/general-information-about-cwa-section-404g"},{"title":"","url":"https:\/\/www.epa.gov\/cwa-404\/policy-and-guidance-documents-under-cwa-section-404"},{"title":"","url":"https:\/\/nepis.epa.gov\/Exe\/ZyPURL.cgi?Dockey=200054B5.TXT"},{"title":"","url":"https:\/\/www.epa.gov\/cwa-404\/headwater-streams-what-are-they-and-what-do-they-do"},{"title":"","url":"https:\/\/19january2021snapshot.epa.gov\/cwa-404\/clean-water-act-section-404-and-agriculture_.html"},{"title":"","url":"https:\/\/www.law.cornell.edu\/cfr\/text\/33\/320.2"},{"title":"","url":"https:\/\/19january2021snapshot.epa.gov\/cwa-404\/memorandum-individual-permit-flexibility-small-landowners-under-cwa-section-404_.html"},{"title":"","url":"https:\/\/www.epa.gov\/system\/files\/documents\/2026-01\/final-rule-overview_cwa-section-404g_22dec2025_508.pdf"},{"title":"","url":"https:\/\/www.epa.gov\/sites\/default\/files\/2015-08\/documents\/coal_mining_memo_0.pdf"},{"title":"","url":"https:\/\/cdxapps.epa.gov\/cdx-enepa-II\/public\/action\/nepa\/details?attachmentId=419456&downloadAttachment="},{"title":"","url":"https:\/\/19january2021snapshot.epa.gov\/sites\/static\/files\/documents\/Solar-Millennium-NOI.pdf"},{"title":"","url":"https:\/\/www.epa.gov\/sites\/default\/files\/2016-03\/documents\/404c.pdf"},{"title":"","url":"https:\/\/19january2021snapshot.epa.gov\/sites\/static\/files\/2016-09\/documents\/final_mtm_guidance_-_signed.pdf"},{"title":"","url":"https:\/\/en.wikipedia.org\/wiki\/Clean_Water_Act"},{"title":"","url":"https:\/\/en.wikipedia.org\/wiki\/Nonpoint_source_water_pollution_regulations_in_the_United_States"},{"title":"","url":"https:\/\/en.wikipedia.org\/wiki\/United_States_Army_Corps_of_Engineers"},{"title":"","url":"https:\/\/en.wikipedia.org\/wiki\/United_States_Environmental_Protection_Agency"},{"title":"","url":"https:\/\/en.wikipedia.org\/wiki\/Best_management_practice_for_water_pollution"},{"title":"","url":"https:\/\/en.wikipedia.org\/wiki\/Coeur_Alaska%2C_Inc._v._Southeast_Alaska_Conservation_Council"},{"title":"","url":"https:\/\/www.reddit.com\/r\/Environmental_Careers\/comments\/1s9p135\/clean_water_act_permitting_documents\/"},{"title":"","url":"https:\/\/www.reddit.com\/r\/USACE\/comments\/1s2o63f\/question_on_1978_section_404_permit_feis\/"},{"title":"","url":"https:\/\/www.permits.performance.gov\/tools\/permit-inventory\/section-10-rivers-and-harbors-act-1899"},{"title":"","url":"https:\/\/www.transit.dot.gov\/regulations-and-guidance\/environmental-programs\/navigable-waterways-and-coastal-zones"},{"title":"","url":"https:\/\/www.epa.gov\/cwa-404\/section-10-rivers-and-harbors-appropriation-act-1899"},{"title":"","url":"https:\/\/www.law.cornell.edu\/cfr\/text\/33\/322.5"},{"title":"","url":"https:\/\/www.nao.usace.army.mil\/Missions\/Regulatory-Branch\/Jurisdiction-and-Permit-Authorities\/"},{"title":"","url":"https:\/\/www.poa.usace.army.mil\/Missions\/Regulatory\/Regulations-and-Resources\/"},{"title":"","url":"https:\/\/www.permits.performance.gov\/proj\/washington-dc-baltimore-loop-project\/section-10-rivers-and-harbors-act-1899"},{"title":"","url":"https:\/\/www.poh.usace.army.mil\/Missions\/Regulatory\/USACE-Regulations-and-Resources\/"},{"title":"","url":"https:\/\/legalclarity.org\/rivers-and-harbors-act-section-10-permits-and-penalties\/"},{"title":"","url":"https:\/\/www.permits.performance.gov\/proj\/hudson-tunnel-project\/section-10-rivers-and-harbors-act-1899-and-section-404-clean-water-act"},{"title":"","url":"https:\/\/www.spk.usace.army.mil\/Missions\/Regulatory\/Jurisdiction\/Rivers-Harbors-Act\/"},{"title":"","url":"https:\/\/des.sc.gov\/sites\/des\/files\/Documents\/BOW\/Stormwater\/SCDESCGP2026.pdf"},{"title":"","url":"https:\/\/www.nws.usace.army.mil\/Portals\/27\/docs\/regulatory2\/AQ\/20210331-AQ-Workshop-Presentation.pdf?ver=6hviyRTOtWHa3--gPciFpw%3D%3D"},{"title":"","url":"https:\/\/forloveofwater-wp-uploads.s3.us-east-2.amazonaws.com\/wp-content\/uploads\/2016\/04\/2025.12.05_GL-Tunnel-Supp-DEIS-Comms_Flow_Sierra-Club_Surfrider_final.pdf"},{"title":"","url":"https:\/\/www.spk.usace.army.mil\/Portals\/12\/documents\/regulatory\/Reg_workshop\/2023-11-01\/2023-11-01-RPW-4-PGP10-Overview.pdf"},{"title":"","url":"https:\/\/www.nyc.gov\/assets\/oec\/technical-manual\/2014_ceqr_technical_manual_rev_04_27_2016.pdf"},{"title":"","url":"https:\/\/www.boem.gov\/sites\/default\/files\/uploadedFiles\/BOEM\/About_BOEM\/BOEM_Regions\/Alaska_Region\/Leasing_and_Plans\/Plans\/1999-5-3_US_Corp_of_Engineers_Alaska_Distric_Record_of_Decision.pdf"}]}}